IT Infrastructure
Our Businesses

ITINFRASTRUCTURE

_ Structured Cabling ยท Networking ยท Wireless ยท Surveillance
Capabilities

OurServices

๐Ÿ”Œ

Structured Cabling

Cat6A/6/5e, fibre optic, and custom cable management systems.

๐ŸŒ

Network Design

LAN/WAN architecture, routing, switching, and VLAN segmentation.

๐Ÿ“ก

Wireless Systems

Enterprise Wi-Fi 6/6E, RF planning, and site surveys.

๐Ÿ“น

IP Surveillance

AI-powered CCTV, NVR/DVR systems, and remote monitoring.

๐Ÿ–ฅ๏ธ

Server Room Setup

Rack installation, UPS, PDU, and environmental monitoring.

๐Ÿ“ž

Unified Comms

VoIP, video conferencing, collaboration platforms.

Technology Partners
Cisco
HPE
Dell
Aruba
Ubiquiti
Hikvision
Fortinet
Juniper
Featured Project

CorporateHQNetwork

IT Project
12,000Network Ports
99.99%Uptime SLA
280Ksq. ft. Covered
48hrsDeployment Sprint
How We Work

OurDeliveryProcess

01

Discovery

Site audit, requirement analysis, and capacity planning.

02

Design

Network architecture, cabling layout, and technology selection.

03

Procurement

Vendor selection, BoM finalisation, and logistics management.

04

Deployment

Installation, configuration, and systems integration.

05

Handover

Testing, documentation, user training, and SLA support.

IT infrastructure installation for offices, factories, campuses and institutions โ€” structured cabling, network hardware, wireless, server rooms and surveillance, designed as one system and handed over tested and certified. Felicet installs the physical layer everything else in the building depends on.

The physical layer, done once, properly

Structured cabling is the part of a building nobody sees and everybody depends on. Done well, it outlasts three generations of the equipment plugged into it. Done badly, it produces intermittent faults that are blamed on software for years. The difference is almost entirely installation discipline: bend radius, separation from power, pathway fill, labelling and certified testing on every link.

A typical installation covers:

  • Copper structured cabling โ€” Cat6A, Cat6 and Cat5e, with every link tested and the results handed over
  • Fibre backbone โ€” single-mode and multi-mode, fusion spliced, with OTDR traces documented
  • Network hardware โ€” switching, routing, VLAN segmentation and LAN/WAN architecture
  • Enterprise wireless โ€” Wi-Fi 6 and 6E with RF planning and pre- and post-installation site surveys
  • Server rooms โ€” racks, UPS, PDUs, containment and environmental monitoring
  • IP surveillance and unified communications, sharing the same tested infrastructure

Installed around your working day

Most IT infrastructure goes into buildings that are already occupied. That constrains the method more than the design: cabling pulled above live workstations, switch-overs run at night, and floors returned to use each morning whether or not the work is finished. We plan around it rather than asking the client to vacate.

On new-build projects we prefer to be involved while the structure is still open, because containment and pathways are far cheaper to install before ceilings close than after.

Common questions

Do you certify the cabling you install?
Yes. Every copper link is tested to its category and every fibre run gets an OTDR trace, with the results handed over as part of the documentation. Untested cabling is just cable โ€” the test results are what let a future fault be isolated in minutes rather than days.
Can you work with our existing network equipment?
Usually, yes. We assess what is installed, what is still supported by the vendor, and what is actually limiting performance. Replacing hardware that works is an easy recommendation to make and a hard one to justify, so we separate what must change from what could.
Do you handle the server room as well as the cabling?
Yes โ€” racks, UPS, power distribution, containment, cooling and environmental monitoring. For larger requirements the same team delivers full data centre builds, which is the same discipline applied to redundancy and capacity at a different scale.
How long does a typical office installation take?
It depends on points count and access rather than floor area. A single floor fit-out of a few hundred outlets is usually a matter of weeks; a multi-building campus runs to months and is phased so that each area is commissioned as it completes rather than everything landing at the end.

DesignYourNetwork

From a single office to a multi-site enterprise, we build networks that scale.

Start Planning โ†’